Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13676725
- Product Categories
- Friendly Links
Information Name: | Shanghai kindergarten EPDM plastic flooring quote |
Published: | 2015-03-21 |
Validity: | 0 |
Specifications: | 13mm |
Quantity: | 10000000.00 |
Price Description: | |
Detailed Product Description: | Product Name: EPDM plastic nursery floor Brand: Chun Rui Price: 80 yuan / square meter, the main projects: EPDM plastic nursery floor two, currently the most common of all-weather sports venues polyurethane plastic surface, the surface layer of polyurethane plastic sports venues have been recognized as the best sports venues, generally for the majority of the sports sector and educators are respected, has been widely used in domestic large, primary and nursery school track and field, fitness and other venues. Athletes and children can play good cushioning and protection, and low prices, more for schools and kindergartens, residential use. Third, the product features: elastic medium: smooth running and jumping sports are comfortable. Wear resistance: flat and durable. Weather: the rain can be used. Easy maintenance: low maintenance costs, simple construction, easy to clean. Safety: slip, and will not release any toxic substances. 5, Uses and Benefits: polyurethane surfacing material is a new type of polymer composite materials, high strength, good elasticity, abrasion resistance, non-slip, anti-aging, sticky and strong, beautiful color, good integrity, flat space, with natural and easy maintenance, with good sports usage characteristics. After the completion of plastic not only for training and competition venues, fitness use, for extensive sports provides a good environment. Six, EPDM ground layer structure: a certain intensity a) plastic sports venues must be laid in asphalt or concrete, based on the requirements of the surface is flat, and there is: polyurethane surface layer (9mm) surface layer of particles (4mm color) seven, plastic construction site and stability. b) the basis of the surface should be kept clean and dry. Asphalt or concrete foundation to be maintained after the completion of 3 days or more in the summer, winter 10 days or more, to ensure that the plastic surface and the base has sufficient cohesive strength. c) the substrate laying - mechanical agitation - artificial coverings - artificial Scraping - dash and other operations processes. Eight, construction procedures: a) ground handling:. I really need to remove dirt ground. ii. If the floating floor protruding material to be polished spatula, eradicated. b) Construction ground rendering: On the basis of the surface with a polyurethane glue brush again, in order to ensure the underlying bond strength plastic layer with the underlying surface. c) the laying of the material mixing:. i stir with a plastic cloth laying must first place in order to ensure the quality of the environment clean and after construction. ii. When the material must first enable the cover clean. iii. the rubber particles should be poured, then pour polyurethane glue. When the glue should be poured directly into the center of the barrel, do not pour down the barrel side, so as not to attach material barrel side, without mixing. iv. tank scraper shave excess material application, in order to avoid losses and uneven mixing ratio of the material. v. the volume of the stirring vessel is at least 1.5 times the volume of the material. When vi. With the amount is less than the amount of packaging, weighing scales before mixing applications. vii. When mixing, mixer blades should be turning left and right, and the material, stir, time for 3-5 minutes. . viii black particles bottoming at 6: 1 ratio, then stir evenly with glue, paving, compaction level requirements. . ix EPDM surface lay: with one-component polyurethane adhesive backing, according to 1: 5 ratio of the surface layer of glue and colored EPDM granules mixed mix, laying the desired color. x. After mixing the material, applicable for the summer time 30-45 minutes, 1-2 hours for the winter, the hardening time is 12-24 hours, then the effective time is 7 days. xi. Containers should be circular, square or avoid using angle-type container to avoid uneven mixing the corner. d) crossed: A: Standard figure crossed by the venue, or by Party requirements. B: done by professionals. C: In accordance with the provisions of the size of the venue, with a tape measure, ink line well marked. D: The paint must be crossed 685 white polyurethane paint. Nine, plastic field on the ground floor of maintenance and repair: 1: Plastic athlete training and competition venues and fitness training and may not be used for other purposes. 2: Plastic venues plastic surface after laying is completed, summer maintenance need 2-3 days, 7-10 days before winter use. 3: plastic venues edges should be protected against arbitrary tilt, if found damaged curbs, should be immediately repaired. 4: plastic venues prohibit all vehicle can not heap ballast, and should avoid sharp thorns draw things venue. 5: Avoid contact with organic solvents, chemicals, cigarette butts and other fire. 6: Regularly clean, you can use water to clean, oil stains with detergent cleaned. Ten, after-sales service: The company's plastic construction site after the completion of the plan for the delivery date of the Party for two years free warranty and lifetime maintenance, after the warranty expires, the fees collected. Shanghai Spring Rui Sports Equipment Co., Ltd. is specialized in the production of plastic track, plastic flooring, rubber floor mats, acrylic and medium-sized children's toys. The company set design, production, sales and construction in one. The company has specialized in the production of polyurethane surfacing materials chemical machinery and equipment, advanced production technology, perfect testing equipment and experienced team of professionals, the company has an annual production of polyurethane products 6000 tons, annual output of 150,000 square meters safety mats , plastic sports venues 200,000 square meters, a variety of large and small children's toys, fitness equipment 100,000 sets of capacity, product quality by the National Sporting goods authority ECUST quality system testing, performance in full compliance with GB / T14833-93 national standards. We follow the "relying on scientific and technological innovation, with quality service and customer satisfaction" business purpose, the principle of "credit, fine construction, courage and innovation", dedicated to providing our customers with quality services. Tel: 18302143259 021--69217672 website address: www.021168.cn Major customers: Parks | School | Kindergarten | plant | Government | Stadium | Stadium Main products: plastic track, plastic basketball court, nursery floor, plastic tennis courts, plastic stadium, Epoxy |
Admin>>>
You are the 4730 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Spring Rui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4730 visitor
Copyright © GuangDong ICP No. 10089450, Sports Equipment Co., Ltd. Shanghai Spring Rui All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility